From: Developing a dynamic growth model for teak plantations in India
Model
Parameter
Estimate
RMSE
Adjusted model efficiency
Equation (4) a 2 + 1 1 − a 3 = 2 *
a 1
1.67 × 10−8
38.3550
0.9877
a 2
1.8703
a 3
2.4352
rho
0.0684
Equation (12)
k
0.4*
0.5731
0.9937
c 1
0.1*
b 1
0.1663
0.0504